Award to marginProgress claims

Flows · Contracting · Progress claims
Every progress claim, from work done to cleared invoice, with retention and advances worked out for you.

The contract terms are entered once, when the project opens. Each month the site reports the work done against the BOQ, the claim deducts retention, recovers the advance with its VAT and applies any penalty, the approvals are recorded, and the claim is cleared through ZATCA. At handover the retention comes back on its own invoice.

Retention, advance and penaltiesZATCA Phase 2 claimsOne claims register
One progress claim across the flow, redrawn with sample data.
Where it usually breaks

The claim is built in Excel, and nobody knows what the client still holds.

In most contracting companies the progress claim is a spreadsheet. Someone re-reads the contract every month to find the advance and retention percentages, works out the deductions again, and types the result into the accounts.

On HAL the contract terms sit on the project, so each claim works out its own deductions and posts them to the right ledgers.

1
The contract is re-read every monthAdvance, retention and penalty terms live in a PDF, not in the system.
2
Deductions are worked out by handAdvance recovery with its VAT, retention and penalties are recalculated in Excel for each claim.
3
Retention goes out of sightMonths later nobody can say how much retention the client is holding.
4
Claims and e-invoices drift apartThe claim, the client approval and the ZATCA invoice are tracked in three places.
The flow, stop by stop

From contract terms to retention release

Six stops for one progress claim. The contract terms are entered once and every claim uses them.

1HAL ContractingSet terms

The contract terms are entered once

When the project opens it carries the client, consultant and main contractor, the contract value, whether it is re-measurable or lump sum, the advance, performance bond and retention percentages, and positive or negative re-measurement. Every claim after that reads its terms from the project, so nobody re-reads the contract at month-end.

  • Re-measurable or lump-sum contracts
  • Advance, performance bond and retention percentages
  • A cost centre for the site
Hands on to the next step:a project every claim can read its terms from.
Explore HAL Contracting →
2BOQ and variationsMeasure

The BOQ keeps the contract quantity and tracks every change

Each BOQ item keeps its original contract quantity, while re-measured and variation quantities move beside it. Original, re-measured, variation and revised budgets are kept side by side, and each change is approved through a workflow, so the claim is always measured against the right quantities.

  • Original contract quantity never changes
  • Re-measured and variation quantities beside it
  • Every budget change approved
Hands on to the next step:agreed quantities the work done can be claimed against.
See BOQ control →
3Progress claimsClaim

The claim works out its own deductions

Pick the project and HAL brings its cost centre and contract terms. Enter the work done for the month, with the claim month, client PO and site invoice number, and the claim deducts retention, recovers the advance together with its VAT, and takes off any delay penalty, back-charge or withholding, each to the ledger you choose.

  • Retention by percentage or amount
  • Advance recovered with its VAT
  • Penalties and back-charges to their own ledgers
Hands on to the next step:a claim ready for approval, with every deduction shown.
See claims in HAL Contracting →
4ApprovalsApprove

The claim is approved, and the approvals are on record

The claim goes through your own approval levels before it leaves the company, and the client's approval date is recorded against it. Both sit on the claims register, so anyone can see where a claim is waiting.

  • Unlimited approval levels on any transaction
  • Internal approver on the register
  • Client approval date on the register
Hands on to the next step:an approved claim, ready to be invoiced.
See approvals →
5ZATCA e-invoiceClear

The claim is issued and cleared through ZATCA

The progress claim is issued from HAL as a ZATCA Phase 2 e-invoice, and its e-invoicing status shows on the claims register. The claim, its deductions and its revenue post to the accounts at the same time, so finance does not key a journal.

  • HAL is listed in ZATCA's Solution Providers Directory
  • ZATCA status on the claims register
  • Posted to the ledgers on its own
Hands on to the next step:cleared revenue and a receivable on the project.
Read about ZATCA e-invoicing →
6Retention releaseRelease

At handover, the retention comes back

Retention is held claim by claim and shows on the register as a running balance. At handover it is released with a retention invoice for the same project, so the money the client held is billed and tracked, not forgotten. The register exports to Excel with balance, retention held and advance recovered for every claim.

  • Retention held to date on the register
  • Retention invoice for the same project
  • Register export to Excel
Where it ends:every riyal of retention billed and accounted for.
See retention in HAL Contracting →
The document cycle

Every stop leaves a document: the progress claim cycle

This is the paper trail auditors and finance teams look for. On HAL each document sits on the same record as the one before it, so nobody types it again.

StopDocumentApp
1Set termsContract terms on the projectHAL Contracting
2MeasureBOQ with re-measured and variation quantitiesBOQ and variations
3ClaimProgress claim with its deductionsProgress claims
4ApproveInternal and client approvalApprovals
5ClearZATCA e-invoice on the claims registerZATCA e-invoice
6ReleaseRetention invoice at handoverRetention release
What changes

The contract is read once, and every claim follows it

Claims without the ExcelAdvance recovery, retention, penalties and VAT come out of the claim itself.
Retention you can seeThe register shows how much the client holds on every project, and the release is invoiced at handover.
One record per claimWork done, approvals, ZATCA status and receivable sit on the same claim.
Questions

What people ask about progress claims

What is a progress claim?

A progress claim is the periodic invoice a contractor raises for the work done in a period, after deducting the advance recovery, retention and any penalties set in the contract.

How is a progress claim calculated on HAL?

You enter the work done against the BOQ. HAL reads the contract terms from the project and deducts retention by percentage or amount, recovers the advance with its VAT, and takes off any penalty, back-charge or withholding, each to its own ledger.

How is retention handled?

Retention is held on each claim and shown on the claims register as a balance. At handover it is released with a retention invoice for the same project.

Are progress claims ZATCA compliant?

Progress claims and retention invoices are issued and cleared from HAL through ZATCA Phase 2, and HAL is listed in ZATCA's Solution Providers Directory. Each claim's ZATCA status shows on the claims register.

Does it handle variation orders and re-measurement?

Yes. The BOQ keeps the original contract quantity and tracks re-measured and variation quantities beside it, and each budget change is approved through a workflow.

What documents are in the progress claim cycle?

In order: Contract terms on the project, BOQ with re-measured and variation quantities, Progress claim with its deductions, Internal and client approval, ZATCA e-invoice on the claims register, Retention invoice at handover. In HAL each one sits on the same record as the one before it.

More flows

See how other industries run on HAL

Contracting and construction · Award to marginFrom contract award to project marginBudget and BOQ control on every site request, manpower on the project, and ZATCA progress claims.HAL ContractingHAL PurchaseHAL InventoryHR & PayrollProgress claimsHAL AccountingSee this flow →Facilities managementFrom a reported fault to a verified fixRequests with photos, jobs with checklists, parts raised from the job and a supervisor sign-off.Service requestsWork ordersTechnician jobsHAL PurchaseSupervisor sign-offSee this flow →RetailFrom the till to the shelf and backPOS checkout with ZATCA e-invoices, branch transfers, purchasing from low stock and a day-end that matches.HAL POSHAL InventoryHAL PurchaseHAL AccountingLoyaltySee this flow →Trading and distributionFrom quotation to cash, and back on the shelfCustomer price lists, reserved stock, invoices from delivery notes, collection follow-ups and landed cost.HAL CRMB2B SalesHAL InventoryHAL InvoicingHAL PurchaseSee this flow →Schools · StudentsFrom online admission to the fee receiptAdmissions, student records, locked exam marks, released report cards, the parent portal and online fees.Online admissionsStudent managementExaminationsReport cardParent portalOnline fee paymentSee this flow →Schools · ParentsThe school year from the parent's sideApply and sign by link, follow the child's day, talk to the teacher, pay fees and open report cards in one app.Registration linkEnrolment contractMobile appMessagesOnline fee paymentExams and report cardsSee this flow →Schools · TeachersA teacher's career, hire to retireRecruitment, contract and iqama, geo-fenced attendance, HAL Learn, payroll with GOSI and WPS, appraisal and end of service.RecruitmentContract and iqamaTime & AttendanceHAL LearnHR & PayrollAppraisalEnd of serviceSee this flow →Service companiesFrom first inquiry to renewalWin the deal, onboard the customer, keep every file and answer every ticket with the history in view.HAL CRMHAL ProjectsHAL DriveKnowledge baseHAL SupportSee this flow →Online stores and bookingsFrom a WhatsApp question to a repeat customerStore link, CRM follow-up, online payment, ZATCA e-invoice, VAT return and the next order.HAL StoreHAL CRMHAL StoreHAL InvoicingHAL AccountingHAL StoreSee this flow →

All flows →

See the whole flow

Bring last month's claim

Book a demo with a BOQ and last month's progress claim. We'll build the same claim in HAL with its retention, advance recovery and ZATCA e-invoice.

رحلات · المقاولات · المستخلصات
كل مستخلص، من الأعمال المنفذة حتى الفاتورة المعتمدة، والمحتجزات والدفعة المقدمة محسوبة تلقائيًا.

تُدخل شروط العقد مرة واحدة عند فتح المشروع. وفي كل شهر يرفع الموقع الأعمال المنفذة مقابل جدول الكميات، فيخصم المستخلص المحتجزات، ويسترد الدفعة المقدمة مع ضريبتها، ويطبق أي غرامة، وتُسجل الاعتمادات، ثم يُعتمد المستخلص لدى هيئة الزكاة والضريبة والجمارك. وعند التسليم تعود المحتجزات بفاتورة مستقلة.

المحتجزات والدفعة المقدمة والغراماتمستخلصات متوافقة مع المرحلة الثانيةسجل واحد للمستخلصات
مستخلص واحد عبر الرحلة، بعرض توضيحي وبيانات تجريبية.
أين تتعثر الرحلة عادةً

المستخلص يُعد في Excel، ولا أحد يعرف كم يحتجز العميل

في معظم شركات المقاولات يكون المستخلص جدول بيانات. يعيد أحدهم قراءة العقد كل شهر ليعرف نسبة الدفعة المقدمة والمحتجزات، ثم يحسب الخصومات من جديد، ويكتب النتيجة في الحسابات.

أما في HAL فشروط العقد محفوظة في المشروع، فيحسب كل مستخلص خصوماته بنفسه ويرحّلها إلى الحسابات الصحيحة.

1
العقد يُقرأ كل شهرشروط الدفعة المقدمة والمحتجزات والغرامات في ملف PDF، لا في النظام.
2
الخصومات تُحسب يدويًااسترداد الدفعة المقدمة مع ضريبتها والمحتجزات والغرامات تُعاد في Excel لكل مستخلص.
3
المحتجزات تغيب عن النظربعد أشهر لا يستطيع أحد أن يقول كم يحتجز العميل.
4
المستخلص والفاتورة يتباعدانالمستخلص واعتماد العميل والفاتورة الإلكترونية تُتابع في ثلاثة أماكن.
الرحلة محطة بمحطة

من شروط العقد حتى إطلاق المحتجزات

ست محطات لمستخلص واحد. تُدخل شروط العقد مرة واحدة، وكل مستخلص يستخدمها.

1HAL Contractingالشروط

تُدخل شروط العقد مرة واحدة

عند فتح المشروع يحمل العميل والاستشاري والمقاول الرئيسي، وقيمة العقد، وهل هو قابل لإعادة القياس أم مبلغ مقطوع، ونسب الدفعة المقدمة وضمان حسن التنفيذ والمحتجزات، وإعادة القياس بالزيادة أو النقص. وكل مستخلص بعد ذلك يقرأ شروطه من المشروع، فلا يعيد أحد قراءة العقد في نهاية الشهر.

  • عقود قابلة لإعادة القياس أو بمبلغ مقطوع
  • نسب الدفعة المقدمة وضمان حسن التنفيذ والمحتجزات
  • مركز تكلفة للموقع
ينتقل إلى الخطوة التالية:مشروع يقرأ منه كل مستخلص شروطه.
تعرّف على HAL Contracting ←
2جدول الكمياتالقياس

جدول الكميات يحفظ كمية العقد ويتابع كل تغيير

يحتفظ كل بند في جدول الكميات بكمية العقد الأصلية، بينما تتحرك بجانبها كميات إعادة القياس وأوامر التغيير. وتُحفظ الميزانية الأصلية والمعاد قياسها وميزانية التغيير والمعدّلة جنبًا إلى جنب، ويُعتمد كل تغيير عبر مسار موافقات، فيُقاس المستخلص دائمًا على الكميات الصحيحة.

  • كمية العقد الأصلية لا تتغير
  • كميات إعادة القياس وأوامر التغيير بجانبها
  • كل تغيير في الميزانية معتمد
ينتقل إلى الخطوة التالية:كميات متفق عليها يُطالب عنها بالأعمال المنفذة.
التحكم بجدول الكميات ←
3المستخلصاتالمطالبة

المستخلص يحسب خصوماته بنفسه

اختر المشروع فيُحضر HAL مركز التكلفة وشروط العقد. أدخل الأعمال المنفذة للشهر، مع شهر المستخلص وأمر شراء العميل ورقم فاتورة الموقع، فيخصم المستخلص المحتجزات، ويسترد الدفعة المقدمة مع ضريبتها، ويخصم أي غرامة تأخير أو خصم مقابل أعمال أو استقطاع، كلٌّ إلى الحساب الذي تختاره.

  • المحتجزات بنسبة أو بمبلغ
  • استرداد الدفعة المقدمة مع ضريبتها
  • الغرامات والخصومات إلى حساباتها
ينتقل إلى الخطوة التالية:مستخلص جاهز للاعتماد، وكل خصم ظاهر فيه.
المستخلصات في HAL Contracting ←
4الاعتماداتالاعتماد

يُعتمد المستخلص، والاعتمادات مسجلة

يمر المستخلص بمستويات الاعتماد لديك قبل أن يخرج من الشركة، ويُسجل تاريخ اعتماد العميل عليه. ويظهر الاثنان في سجل المستخلصات، فيعرف الجميع أين ينتظر كل مستخلص.

  • مستويات اعتماد غير محدودة لأي معاملة
  • المعتمد الداخلي في السجل
  • تاريخ اعتماد العميل في السجل
ينتقل إلى الخطوة التالية:مستخلص معتمد جاهز للفوترة.
الاعتمادات في HAL ←
5الفاتورة الإلكترونيةالاعتماد الضريبي

يصدر المستخلص ويُعتمد لدى الهيئة

يصدر المستخلص من HAL كفاتورة إلكترونية متوافقة مع المرحلة الثانية، وتظهر حالة الفوترة الإلكترونية في سجل المستخلصات. ويُرحّل المستخلص وخصوماته وإيراده إلى الحسابات في نفس الوقت، فلا تكتب المالية أي قيد.

  • HAL مُدرج في دليل مزودي الحلول لدى الهيئة
  • حالة الهيئة في سجل المستخلصات
  • ترحيل تلقائي إلى الحسابات
ينتقل إلى الخطوة التالية:إيراد معتمد وذمة مدينة على المشروع.
عن الفوترة الإلكترونية ←
6إطلاق المحتجزاتالإطلاق

عند التسليم تعود المحتجزات

تُحتجز المحتجزات في كل مستخلص وتظهر في السجل كرصيد متراكم. وعند التسليم تُطلق بفاتورة محتجزات لنفس المشروع، فيُفوتر المال الذي احتجزه العميل ويُتابع ولا يُنسى. ويُصدَّر السجل إلى Excel مع الرصيد والمحتجزات والدفعة المستردة لكل مستخلص.

  • المحتجزات حتى تاريخه في السجل
  • فاتورة محتجزات لنفس المشروع
  • تصدير السجل إلى Excel
أين تنتهي الرحلة:كل ريال من المحتجزات مفوتر ومحسوب.
المحتجزات في HAL Contracting ←
الدورة المستندية

كل محطة تترك مستندًا: الدورة المستندية للمستخلصات

هذا هو المسار المستندي الذي يبحث عنه المراجعون وفريق المالية. وفي HAL يرتبط كل مستند بنفس السجل الذي سبقه، فلا يعيد أحد إدخاله.

المحطةالمستندالتطبيق
1الشروطشروط العقد في المشروعHAL Contracting
2القياسجدول الكميات مع إعادة القياس وأوامر التغييرجدول الكميات
3المطالبةالمستخلص بخصوماتهالمستخلصات
4الاعتمادالاعتماد الداخلي واعتماد العميلالاعتمادات
5الاعتماد الضريبيالفاتورة الإلكترونية في سجل المستخلصاتالفاتورة الإلكترونية
6الإطلاقفاتورة المحتجزات عند التسليمإطلاق المحتجزات
ما الذي يتغير

العقد يُقرأ مرة واحدة، وكل مستخلص يتبعه

مستخلصات بلا Excelاسترداد الدفعة المقدمة والمحتجزات والغرامات والضريبة تخرج من المستخلص نفسه.
محتجزات تراهايعرض السجل كم يحتجز العميل في كل مشروع، ويُفوتر الإطلاق عند التسليم.
سجل واحد لكل مستخلصالأعمال المنفذة والاعتمادات وحالة الهيئة والذمة المدينة في نفس المستخلص.
أسئلة شائعة

ما يسأل عنه الناس في المستخلصات

ما هو المستخلص؟

المستخلص هو الفاتورة الدورية التي يرفعها المقاول عن الأعمال المنفذة خلال فترة، بعد خصم استرداد الدفعة المقدمة والمحتجزات وأي غرامات ينص عليها العقد.

كيف يُحسب المستخلص في HAL؟

تُدخل الأعمال المنفذة مقابل جدول الكميات، فيقرأ HAL شروط العقد من المشروع ويخصم المحتجزات بنسبة أو بمبلغ، ويسترد الدفعة المقدمة مع ضريبتها، ويخصم أي غرامة أو خصم أو استقطاع، كلٌّ إلى حسابه.

كيف تُعالج المحتجزات؟

تُحتجز المحتجزات في كل مستخلص وتظهر في سجل المستخلصات كرصيد. وعند التسليم تُطلق بفاتورة محتجزات لنفس المشروع.

هل المستخلصات متوافقة مع هيئة الزكاة والضريبة والجمارك؟

تصدر المستخلصات وفواتير المحتجزات من HAL وتُعتمد عبر المرحلة الثانية، وHAL مُدرج في دليل مزودي الحلول لدى الهيئة. وتظهر حالة كل مستخلص لدى الهيئة في سجل المستخلصات.

هل يدعم أوامر التغيير وإعادة القياس؟

نعم. يحتفظ جدول الكميات بكمية العقد الأصلية ويتابع كميات إعادة القياس وأوامر التغيير بجانبها، ويُعتمد كل تغيير في الميزانية عبر مسار موافقات.

ما المستندات في الدورة المستندية للمستخلصات؟

بالترتيب: شروط العقد في المشروع، ثم جدول الكميات مع إعادة القياس وأوامر التغيير، ثم المستخلص بخصوماته، ثم الاعتماد الداخلي واعتماد العميل، ثم الفاتورة الإلكترونية في سجل المستخلصات، ثم فاتورة المحتجزات عند التسليم. وفي HAL يرتبط كل مستند بنفس السجل الذي سبقه.

رحلات أخرى

شاهد كيف تعمل القطاعات الأخرى على HAL

المقاولات والإنشاءات · من الترسية إلى الربحمن ترسية العقد حتى ربح المشروعضبط الميزانية وجدول الكميات في كل طلب من الموقع، والعمالة على المشروع، ومستخلصات معتمدة من هيئة الزكاة.HAL للمقاولاتHAL PurchaseHAL Inventoryالموارد البشرية والرواتبالمستخلصاتHAL Accountingشاهد هذه الرحلة ←إدارة المرافق والصيانةمن بلاغ العطل حتى الإصلاح المُتحقق منهطلبات مع صور، وأوامر عمل بقوائم فحص، وقطع غيار تُرفع من أمر العمل، واعتماد من المشرف.طلبات الخدمةأوامر العملمهام الفنيينHAL Purchaseاعتماد المشرفشاهد هذه الرحلة ←التجزئةمن نقطة البيع إلى الرف ثم العودةنقطة بيع بفاتورة إلكترونية معتمدة، وتحويلات للفروع، وشراء من نقص المخزون، وإقفال يوم متطابق.HAL POSHAL InventoryHAL PurchaseHAL Accountingبرنامج الولاءشاهد هذه الرحلة ←التجارة والتوزيعمن عرض السعر حتى التحصيل، ثم إلى الرفقوائم أسعار للعملاء، ومخزون محجوز، وفواتير من سندات التسليم، ومتابعة التحصيل، والتكلفة حتى الوصول.HAL CRMمبيعات B2BHAL Inventoryإصدار الفواتيرHAL Purchaseشاهد هذه الرحلة ←المدارس · الطلابمن القبول الإلكتروني حتى إيصال الرسومالقبول، وسجلات الطلاب، ودرجات مقفلة، وشهادات معتمدة، وبوابة ولي الأمر، والرسوم إلكترونيًا.القبول الإلكترونيإدارة الطلابالاختباراتالشهادةبوابة ولي الأمردفع الرسوم إلكترونيًاشاهد هذه الرحلة ←المدارس · أولياء الأمورالعام الدراسي كما يراه ولي الأمرالتقديم والتوقيع عبر رابط، ومتابعة يوم الطالب، والتواصل مع المعلم، ودفع الرسوم وفتح الشهادات في تطبيق واحد.رابط التسجيلعقد التسجيلتطبيق الجوالالرسائلدفع الرسوم إلكترونيًاالاختبارات والشهاداتشاهد هذه الرحلة ←المدارس · المعلمونمسيرة المعلم من التعيين حتى نهاية الخدمةالتوظيف، والعقد والإقامة، والحضور الجغرافي، وHAL Learn، والرواتب مع التأمينات وحماية الأجور، والتقييم، ونهاية الخدمة.التوظيفالعقد والإقامةالحضور والإجازاتHAL Learnالموارد البشرية والرواتبالتقييمنهاية الخدمةشاهد هذه الرحلة ←شركات الخدماتمن أول استفسار حتى التجديداكسب الصفقة، وهيّئ العميل، واحفظ كل ملف، وأجب عن كل تذكرة وتاريخ العميل أمامك.HAL CRMHAL ProjectsHAL Driveقاعدة المعرفةHAL Supportشاهد هذه الرحلة ←المتاجر الإلكترونية والحجوزاتمن سؤال على واتساب إلى عميل يعودرابط المتجر، ومتابعة في CRM، ودفع إلكتروني، وفاتورة إلكترونية، وإقرار ضريبي، والطلب التالي.HAL StoreHAL CRMHAL StoreHAL InvoicingHAL AccountingHAL Storeشاهد هذه الرحلة ←

كل الرحلات ←

شاهد الرحلة كاملة

أحضر مستخلص الشهر الماضي

احجز عرضًا ومعك جدول الكميات ومستخلص الشهر الماضي، وسنبني نفس المستخلص في HAL مع المحتجزات واسترداد الدفعة المقدمة والفاتورة الإلكترونية.